GGU-CONSOLIDATE: "Installation time (vertical drains)" menu item

This menu item is only active if you have selected "Consolidation with both types (numerical)" as the consolidation type.

You must define the installation time of the vertical drains. The time from which the vertical drains are incorporated in the analysis is marked in the evaluation diagrams.