Manuals

GGU-LATPILE: Step 2: Enter system data

Go to the menu item "Editor 1/ System input" and enter the data for the pile head loading.

att_1_for_601194506.png

The pile width is required for determination of the spatial passive earth pressure. Using this menu item, you also enter any groundwater level and distributed loads .